Plans need an engineering stamp
Architectural or draftsperson plans are permit-ready in everything except the structural sheets. We seal the foundation, framing, and lateral design and return a stamp-ready package.
FBC 2023 + ASCE 7-22 compliant structural design, engineering letters, and plan reviews for Central Florida projects. Wind-load, flood-zone, and HVHZ considerations built in — not bolted on.
If your project matches one of these, you are in the right place. Send the drawings, the address, or the permit comment — we take it from there.
Architectural or draftsperson plans are permit-ready in everything except the structural sheets. We seal the foundation, framing, and lateral design and return a stamp-ready package.
An older building, a renovation, a buyer's due diligence, or an insurer's request. We assess the as-built condition and issue a stamped engineering letter documenting what the structure can support.
The jurisdiction returned a correction letter on the structural sheets. We resolve the comments, revise the calculations and details, and resubmit a clean package that clears review.
Tell us where the project is and what you need. A licensed structural engineer reviews your request and responds with scope, fee, and timeline.
From new construction to existing-building evaluation to permit-plan review — all under current Florida code.
Foundations, framing, and lateral systems engineered for the actual building geometry and Florida wind loads. Wood, light-gauge steel, structural steel, concrete, and masonry — sized for both jurisdiction review and contractor pricing.
On-site assessment and sealed engineering letter documenting the load capacity and condition of an existing building. Used for renovations, additions, property purchase, insurance, and lender requirements.
Review of plans prepared by another designer for FBC 2023 and ASCE 7-22 compliance. We correct flagged issues, stamp the structural sheets, and return a permit-ready package — or document revisions the original designer must make.
Florida structural engineering is not generic. Wind, flood, and soil conditions drive the design. Here is what we account for and what lands in your hands.
Florida Building Code adopts on a 3-year cycle. We work to the current cycle plus the referenced standards that govern structural design.
Building, Existing Building, and Residential volumes — current adoption cycle. Governs all structural design in Florida jurisdictions.
Minimum Design Loads. Wind speed maps, seismic, snow, rain, and flood load criteria referenced by FBC 2023.
Building Code Requirements for Structural Concrete, with FBC-adopted modifications. Cast-in-place, post-tension, and precast.
Steel building specification. Connection design, brace frames, and moment frames where used in the lateral system.
National Design Specification for wood construction. Sawn lumber, engineered wood, glulam, and CLT mass-timber.
Florida Building Code, Existing Building volume. Governs structural evaluation, repair, alteration, and addition to existing structures.
Apice supports owners, developers, investors, and project teams that need a clearer technical decision before design drift, permit delays, or expensive rework start compounding.